Our history
More than 25 years of experience cannot be summed up in a single sentence, but “if the power disappears, our equipment will provide it regardless of the situation” comes closest…
This is not a timeline like the ones in history books — a dozen or so moments that changed us as a company for good: from a sales office in a rented room above a shop, through the workshop beside the old steelworks in Trzebinia, to a hall built to our own needs, the time of the pandemic and the shift towards military products forced by the global situation, to the day two companies became one.
Scroll to light the line
before 2000
before 2000
before there was a name
An office in Chrzanów, then the old steelworks site
Before the name EPS System existed, there was knowledge of industrial engines and the parts that go into them — and a first sales office in a rented room in the centre of Chrzanów. From there the company moved to the site of the former steelworks in Trzebinia. Nobody talked about guaranteed power systems back then.
2000
2000
EPS System
Trzebinia, the old steelworks site
On the grounds of the former steelworks, next to the refinery and a few kilometres from the A4 motorway, EPS System is founded. The address — 16 Harcerska Street — will not change for the next quarter of a century. Everything else will.
Since 2000 we have delivered and developed, without interruption, reliable equipment that generates power.
2003
2003
own brand
We start producing generator sets under our own brand
That year we start manufacturing ourselves — buying the components and assembling complete generator sets under our own brand.
2004
1 May 2004
European Union
Poland joins the European Union
We successfully pass the demanding process of assessing our products' conformity with EU directives — from 1 May 2004 every generator set we manufacture carries the required CE mark.
2007
2007
quality
The end of “we'll do it as always and it will be fine”, the start of a procedure
The ISO 9001 quality management system is implemented and the first certification audits are passed: production, sales, installation and service of generator sets, UPS units, DC power plants and battery systems. The company has held the certificate without a break ever since, now as ISO 9001:2015, adding the further certificates needed to keep product quality at the highest level.
2007–13
2007–2013
Lesser Poland ROP · measure 2.1
Building the headquarters we work in today
The building at 16 Harcerska Street — bought and renovated — was occupied in 2006, and soon afterwards construction of the current headquarters begins, in use since 2015. A project under the Lesser Poland Regional Operational Programme, priority axis “Economy of regional opportunity”, makes it possible to build the new headquarters and purchase fixed assets for the company's growth. A hall, offices and an expanded machine park take shape — still the heart of the company today. For the first time EPS System is building something for itself, to grow for its clients.
- PLN 1,879,410
- total project value
2015
August 2015
the company record
The first entry that survived
From August 2015 our history stops being told from memory over coffee and starts being written down. The trade-fair reports alone already number more than fifty, with more to come.
- 50+
- trade-fair reports in the company record
2016–20
2016–2020
Lesser Poland ROP · innovation voucher
Eight families of sets, and a war against noise
An innovation voucher: eight groups of industrial generator sets on Doosan engines, from 130 to 825 kVA. The hardest part of the project had nothing to do with power and everything to do with silence — sound-proofing the enclosure and shaping the attenuating systems on the air intake and outlet. Making a powerful set is not the problem — the hard part is designing and building one that is quiet and fully effective at the same time. We did it.
- 130–825 kVA
- power range of the new family
- 8
- groups of industrial generator sets
2017
2017
EKOGEN
Why not gas?
We enter the market with the first cogeneration units of our own production fuelled by natural gas. That year we built and commissioned the first units with gas engines — an entirely new chapter for the company. The era of EKOGEN units begins, based on engines from leading manufacturers and fuelled by natural gas, biogas and other fuels. The same year we also build the Quadro unit for Unigreg.
2018
2017–2018
capacity market
As a manufacturer we take the other side of the table, together with our clients
On 8 December 2017 the Capacity Market Act comes into force. Instead of merely paying the capacity fee, EPS System starts helping customers become beneficiaries of that market: from 3 April to 29 May 2018 it runs the certification and registration of their units. A generator set that used to stand idle waiting for a failure stops being a cost and becomes a benefit.
- ~PLN 100k
- per year for readiness to reduce, for every megawatt
2020
2020
Smart Growth · measure 3.4
The year the point was not to go dark yourself
Covid and the global situation that came with it. A working-capital grant we secured, financed entirely from European funds. The objective written into the paperwork is dry and bureaucratic — which is exactly why it stays with you. A company that had spent twenty years making sure others never ran out of power had to survive itself — and we did.
- PLN 256,573.77
- support for keeping the business running
Continuation of the enterprise's operations throughout the period for which the grant is awarded.
Impel
the second track
Energy Power Systems
Scale and new markets join the experience
Energy Power Systems is founded as a company of the Impel Capital Group — several dozen entities present in practically every sector of the economy, one of the largest Polish enterprises, recognised in Poland and across Europe. Capital and reach that a single manufacturer from Lesser Poland cannot build alone.
2024
1 February 2024
the merger
Two lines — one result
On that day EPS System and Energy Power Systems join together. A quarter of a century of experience and technology from Trzebinia meets the possibilities of the Impel Group — under one address and one name. On the surface everything changes, yet the experience, the people, the proven hall and the same service team answering the phone at night all remain. The scope changes; the quality and the vision stay the same.
2025
2025
research and development
The first in-house invention on this scale
A high-efficiency cogeneration unit with an energy bank: electricity and heat from one fuel, plus electrical energy storage. Not a licence and not an import — the result of research and development by a team of engineers employed on site in Trzebinia.
- PLN 9,390,337.80
- total project value
- PLN 4,781,630.11
- contribution from European Funds
There are no manufacturers on the Polish market offering equivalent equipment.
2024–now
2024–now
Energy Power Systems
A quarter of a century of experience in one company
Twenty-five years of experience. Close to four thousand installations in Poland and abroad. Our own design office, production and service.
- 25 years
- of uninterrupted work in guaranteed power
- ~4,000
- installations in Poland and abroad
- 10–4125 kVA
- power range of our generator sets
- ISO 9001:2015
- certified quality management system
Years of practice have given us remarkable skills in designing, building, selling and servicing our equipment.
From design through manufacture and installation to service — all of it with our own team. The drawing comes from our design office, the machine from our own plant, and before it leaves for the customer it is tested under load. We size the machine to the site, not the site to the catalogue: from a 10 kVA generator set to units of 4125 kVA, from 50–2500 kWe cogeneration systems to UPS units and containerised builds.
And we stay after commissioning — inspections, parts and repairs are ours, because continuity of supply is the responsibility of whoever built it. Nearly four thousand installations at home and abroad are a quarter of a century of holding to that one principle.