In a data center every nine of availability counts. We deliver redundant power systems that meet SLAs — from UPS units to generator sets in N+1 configurations.

Redundant power architectures for strict SLAs and full continuity of IT services.

99.99%

power availability (Tier III)

N+1

generator and UPS redundancy

2N

A/B supply paths to the rack

Sector challenges

01

Strict SLAs

99.99% availability means less than an hour of downtime per year — the power architecture must eliminate single points of failure.

02

Power density

Growing IT loads and cooling require a precise power balance with reserves for expansion.

03

Risk-free testing

Periodic transfer tests must run without affecting the critical load.

What we deliver

  • Generator sets in redundant N+1 configurations with parallel-operation automation.
  • ON-LINE double-conversion UPS systems for IT loads.
  • Integration with monitoring and BMS systems — full telemetry of the installation.
  • Service agreements with guaranteed response times and on-load testing.

Where we work

Typical facilities for which we size and service power systems in this sector.

Colocation facilities
Enterprise data centers
Telecommunications nodes
Building server rooms
Institutional processing centres

What an outage costs

Before we calculate the power, we calculate the consequences of losing it. They decide the system architecture.

SLA breach

99.99% availability is under an hour of downtime per year. A single event can consume the entire annual budget for unavailability.

Data lost in flight

An abrupt loss of power is not only a service interruption but a risk of corrupting data being written — and a long recovery.

Cooling domino effect

At high power density rack temperatures climb within minutes, so a power failure immediately becomes a cooling failure.

How we work

01

Audit and sizing

We analyse the load profile, inrush currents and the facility's formal requirements.

02

Design and delivery

Our own design office engineers the system; production builds the equipment for your project.

03

Installation and commissioning

Installation, ATS integration, load testing and operator training.

04

Service and care

Periodic inspections and support throughout the system's entire service life.

Standards and requirements

Power architecture follows the availability classifications of ANSI/TIA-942 and EN 50600: no single point of failure, the ability to service equipment without dropping the load, and documented transfer testing. Installations follow PN-HD 60364, and UPS units use ON-LINE double-conversion technology.

Frequently asked questions

What does N+1 redundancy mean in practice?

N is the capacity required to carry the load; +1 is one unit beyond that. A failure of, or service on, any single generator or UPS therefore does not reduce the power available to the load. In 2N systems each path is complete and independent.

How can transfers be tested without risk to clients?

Tests are run with the second supply path intact and full UPS backup in place. Every test scenario is agreed with the operations team beforehand and recorded — that record is what availability audits ask for.

How much fuel needs to be on site?

The standard is 8–12 hours of autonomy on the base tank plus a contract for emergency fuel delivery. For higher requirements we design external tanks with automatic replenishment.